Boiler installation for operation on solid fuel-coal with a capacity of 3.2 tons per hour, to produce steam at a temperature of 194 °C with an outlet working pressure of 1.3 MPa and hot water with a capacity of 6 cubic meters per hour. The boiler is of a modular type, consisting of 4 transportable blocks, docked together. Inside are steam boilers with mechanical grates, operating on solid fuel, blower fans, a pump group, automation tools, an automated heat point for hot water supply, a gas cleaning and air heating unit, shut-off and safety valves, boiler piping, chemical water treatment, and a backup feed water tank. Outside the boiler, install smoke exhausters, a gas duct system, a chimney on stretch marks, a scraper fuel supply with a crushing unit and a receiving hopper, and a scraper slag removal with an ash and slag storage bunker.
Котельная установка для работы на твердом топливе-угле производительностью 3,2 тонны в час, для получения пара температурой 194 °С при рабочем давлении на выходе 1,3 МПа и горячей воды производительностью 6 метров кубических в час.
Котельная модульного типа, состоящая из 4-х транспортабельных блоков, состыкованных между собой.
Внутри находятся паровые котлы с механической топкой, работающие на твердом топливе, вентиляторы дутьевые, насосная группа, средства автоматики, автоматизированный тепловой пункт ГВС, блок газоочистки и подогрева воздуха, запорная и предохранительная арматура, трубопроводы обвязки котельной, химводоподготовка бак запаса подпиточной воды. За пределами котельной установить дымососы, система газоходов, труба дымовая на растяжках, топливоподача скребковая с дробильным узлом и приемным бункером, шлакоудаление скребковое с бункером накопителем золы и шлака.