This sourcing request has expired, please quote as soon as possible next time.
Cummins Spare Parts
Select RFQ
-
Date Posted:
2024-03-05 10:48
From English Site
-
Valid to:2024-05-23
-
Purchase Quantity:
314 Piece(s)
-
Trade Terms:FCA
-
Max budget:>50000 USD
- Payment Terms:T/T
-
Sourcing Request From:Request From:
Uzbekistan
- Shipping Method:Land freight
- Destination:
Uzbekistan
-
Lead time:Ship in 30 day(s) after supplier receives the initial payment.
Quote Left:
0
Root liner cat
Crank pin crank pin cat
Water pump
Water pump assembly cat
Sleeve
Injector cat
Piston ring kit cat
Engine top gasket kit
Engine top gasket kit
Engine top gasket kit
Engine top gasket kit
Engine top gasket kit
Engine top gasket kit
Engine top gasket kit
Engine top gasket kit
Engine top gasket kit
Compressor
Root liners (standard)
Piston rings included
Oil cooler radiator cat
OHV radiator (intercooler radiator)
OHV radiator (intercooler radiator) cat
Oil cooling radiator
Engine Remanufacturing Kit KTA 50 C upper cat.
Engine Remanufacturing Kit KTA 50 C lower cat.
Fuel pump KTA-50S
TPN cat
Turbocompressor cat
Turbocompressor
Turbocompressor
Crank liners (standard)
Attached Files
Please
sign in to download the attachments if you are Premium Member.
Please
sign in to view buyer business information if you are Premium Member.
Quotation Record
8 supplier(s) have provided quotations. Only 0 quoting chance(s) left!
Company Name |
Business Type |
Location |
Quote Time |
Xu******
|
Manufacturer/Factory,Trading Company |
Xuzhou, Jiangsu |
2024-03-05 14:37 |
Ji******
|
Trading Company |
Jinan, Shandong |
2024-03-05 13:15 |
Ni******
|
Trading Company |
Ningbo, Zhejiang |
2024-03-05 12:33 |
Ch******
|
Trading Company |
Chongqing, Chongqing |
2024-03-05 11:38 |
Sh******
|
Trading Company |
Shiyan, Hubei |
2024-03-05 11:36 |
Qu******
|
Manufacturer/Factory |
Wuxi, Jiangsu |
2024-03-05 11:34 |
Ta******
|
Manufacturer/Factory |
Tai'an, Shandong |
2024-03-05 11:19 |
Sh******
|
Manufacturer/Factory & Trading Company |
Jining, Shandong |
2024-03-05 11:09 |