Home Easy Sourcing All Sourcing Requests Agriculture & Food Ripening Rooms to Ripen Malaysian Dates
Ripening Rooms to Ripen Malaysian Dates

Ripening Rooms to Ripen Malaysian Dates Select RFQ

  • Date Posted: 2025-04-17 10:16 From English Site
  • Valid to:2025-07-05
  • Purchase Quantity: 100 Ton(s)
  • Trade Terms:FOB
  • Max budget:>50000 USD
  • Payment Terms:T/T
  • Sourcing Request From:Request From: Malaysia
  • Shipping Method:Sea freight
  • Destination Port: Klang
Quote Left: 8
Product Description Buyer Business Info.
I'm looking for a ripening room supplier to build and ripen 100MT of Malaysian dates.
Details are as follows:

We will put 500kg of dates in 1 pallet mesh of size 1m(w) X 1.2m(l) X 1m(h). So 2 pallet mesh stacked together like the picture will be 1MT. The combined 2 pallet mesh's size is 1m(w) X 1.2m(l) X 2m(h). We call these 2 pallet mesh stacked together as 1 "pallet stack" for easier reference. So for 100MT, we require 100 "pallet stack". The volume for this is 100 X 1m X 1.2X X 2m = 240m3 (cubic metre)

Capacity: Able to ripen up to 100 tons of dates (100 "pallet stack", 240m3)
Number of rooms: At least 5
Temperature: 25C to 38C (Malaysia climate is 25 to 33C)
Humidity: 90-95%
Ethylene ppm: 2, 000 ppm
Ethylene gas system: Ethanol
Monitoring and control system: Able to view and control from Internet.
Even air-circulation is important. We want all areas in the room to have even air circulation.

Other features and info:
1) Low energy usage - Please list your total energy usage and usage per room.
2) Forklift is able to enter the room.
3) Each room must have a 1000L dehumidifier. This is to remove water during rainy season in Malaysia. Fruits are harvested during the rain and will be wet.
4) We may need a pre-treatment of 60C to kill insects when the fruits are first put into the room. If there are no insects, no pre-treatment is needed.
5) We are ok with any number of rooms. Smaller rooms are easier to heat up but may require more machinery. So please find a balance between cost and efficiency. At least 5 rooms is needed.
6) Looks like we may not need coolers since most of the temperature is warm.
7) Due to lack of space, we prefer 2 level like in the picture.

Please list your lead-time and how long to build at our site. Thank you for taking the time to view and to provide us with your quote.

Attached Files

Please sign in to download the attachments if you are Premium Member.

Quotation Record 2 supplier(s) have provided quotations. Only 8 quoting chance(s) left!

Company Name Business Type Location Quote Time
Gu****** Manufacturer/Factory Shenzhen, Guangdong 2025-04-20 00:33
He****** Manufacturer/Factory & Trading Company Hengshui, Hebei 2025-04-18 00:19