This sourcing request has expired, please quote as soon as possible next time.
Moving and Storage
Date Posted:2020-07-03 09:00From English Site
Valid to:2020-08-17
Purchase Quantity:
1 Piece(s)
Trade Terms:FOB
Payment Terms:T/T
Sourcing Request From:Request From: Philippines
Quote Now
Quote Left:
9
Product DescriptionBuyer Business Info.
Good Morning, we are located in the Wuhou district of Chengdu and have one machine to be picked up and stored for approximately one year. The machine is approximately one meter long and about 1/2 meter in diameter, weight is approximately 150kgs, basically a large very heavy pipe. We have the shipping crate the original machine came in, less the top. There is a package of one meter steel rods that is with the machine.
A good pallet jack can accommodate lifting and moving the machine. The machine does not need to be in the crate, but the crate is good to have for future shipping possibilities. A ramp for a truck will allow the machine and pallet jack to be loaded, and off loaded with ease. Currently there is no base for the machine, only a round piece of pipe, making it easier to move. If a pallet jack is not possible, the machine can be rolled out of the apartment, and down the hall to the elevators. The side door out of the apartment offers a ramp the machine can be rolled down, or rolled out with a pallet jack. The truck ramp is needed, as trying to lift the machine into a truck or vehicle would be extremely difficult if not impossible. If the machine can be rolled up a ramp without a pallet jack, just need a few men to push up a ramp.
Our future plans are to relocate to Guangzhou within a year and will require delivery of the machine to the new residence once we arrive.
We require the machine to be picked up soon, as the apartment it is currently at has been rented and we have been asked to remove this machine.
Please sign in to view buyer business information if you are Premium Member.
Quotation Record
1 supplier(s) have provided quotations. Only 9 quoting chance(s) left!