Home Easy Sourcing All Sourcing Requests Industrial Equipment & Components Specification for Boiler Water Tube, Super Heater Tube & Bend, Air Pre-Heater Tube and Economizer Tube.

Specification for Boiler Water Tube, Super Heater Tube & Bend, Air Pre-Heater Tube and Economizer Tube. Select RFQ

  • Date Posted: 2024-12-16 11:11 From English Site
  • Valid to:2025-03-03
  • Purchase Quantity: 1 Piece(s)
  • Trade Terms:CFR
  • Target Unit Price:1.00 USD
  • Max budget:>50000 USD
  • Payment Terms:100% at Side LC
  • Sourcing Request From:Request From: Bangladesh
  • Shipping Method:Sea freight
  • Destination Port: Chittagong
Quote Left: 3
Product Description Buyer Business Info.
Section 7. Technical Specifications
The Goods and Related Services shall comply with following Technical Specifications:
Specification for Boiler water Tube, Super heater tube & bend, Air pre-heater tube and Economizer tube.

Mill Item No. Description, [Size OD × Thickness × Length] Quantity
For 2024-25 season Recommendation
For purchase
A Boiler Water Tube
Cold finished seamless carbon steel boiler Water tubes according to BS EN 10216-1: 2013, steel grade P235TR2 as per following sizes.
TSM
1 76.2 mm. × 3.66 mm. × 5500 mm. 200 200
2 76.2 mm. × 3.66 mm. × 6000 mm. 220 220
3 76.2 mm. × 3.66 mm. × 9000 mm. 80 80
JSM 4 101.6 mm. × 4.5 mm. × 7625mm. 60 60
Carew 5 82.55 mm. × 3.66 mm. × 5285 mm. 60+60 120
6 82.55 mm. × 3.66 mm. × 5350 mm. 40+40 80
7 82.55 mm. × 3.66 mm. × 5470 mm. 40+40 80
8 82.55 mm. × 3.66 mm. × 5650 mm. 60+60 120
9 82.55 mm. × 3.66 mm. × 5965 mm. 80+80 160
10 82.55 mm. × 3.66 mm. × 6050 mm. 40+40 80
11 82.55 mm. × 3.66 mm. × 6465 mm. 80+80 160
12 82.55 mm. × 3.66 mm. × 6760 mm. 40+40 80
MKSM 13 101.6 mm. × 4.5 mm. × 5500 mm 280 100
B Boiler Air pre-heater tube
Cold finished ERW carbon steel Tube, for Air pre- heater of Boiler in accordance with BS EN 10216- 1: 2013, as per following sizes.
NTSM 76.2 mm. × 3.2 mm. × 9000mm. 687 687
RJSM 63.50 mm. × 3.66 mm. × 3785 mm. 800 800
C Cold finished seamless carbon steel boiler Super heater Tubes according to BS EN 10216-1: 2013, as per following sizes.
CAREW 38.1 mm. × 3.66 mm. × 6390 mm 30 30
38.1 mm. × 3.66 mm. × 7000 mm 30 30
FSM 38.1mm. × 3.66 mm. × 7600 mm 100 100



D Cold finished seamless carbon steel boiler Super heater bends according to BS EN 10216-1: 2013, as per following sizes.

FSM 1800 U Bend for super heater tube
U Bend, OD 38.1 mm. ×3.66
As per drg. No 1 75 75

Technical terms & conditions:

A) I. Tubes will be cold finished seamless according to BS EN 10216-1: 2013, steel grade P235TR2
B) Tubes will be annealed up to 6 inch at both ends.
C) Tolerance will be as follows (which is not as per BS EN 10216-1: 2013)
OD + 0.1 mm
Wall Thickness + 0.1 mm
Length + 0 to 12 mm
Straightness will be 1: 600
D) Both ends of the tubes must be fitted with plastic caps.
E) Both ends of the tubes must be perfectly square-cut.
F) Test and test certificate:
The following tests to be done as per BS EN 10216-1: 2013 and the test certificates to be provided along with the shipping document.
I. The ladle analysis for elements specified as per code.
II. The mechanical tests (Tensile, flattening, drift expanding and hydraulic test).
III. Leak tightness test.
IV. The final heat treatment carried out.
V. The grade designation.
G) Packing:
I. The packing must be sea worthy.
II. To be securely packed in a suitable number of bundles strongly fastened by steel strip/ angle (mill and size wise separately).
III. The entire length of the tubes must be protected by anti-corrosive paint / oil against corrosion during shipment /transport and storage.
H) The manufacturer must be an international reputed boiler tube manufacturer.
I) The manufacturer of the tubes and bends must have valid and up to date ISO 9001-2015 certificate and the same to be submitted along with the offer.
J) Tenderers must submit catalogue/ brochures in original along with the offer.
K The manufacturer must have website

Attached Files

Please sign in to download the attachments if you are Premium Member.

Quotation Record 7 supplier(s) have provided quotations. Only 3 quoting chance(s) left!

Company Name Business Type Location Quote Time
Tr****** Manufacturer/Factory & Trading Company Guangzhou, Guangdong 2024-12-23 09:18
DF****** Manufacturer/Factory Shijiazhuang, Hebei 2024-12-19 11:42
Ja****** Manufacturer/Factory Huizhou, Guangdong 2024-12-17 13:44
Sh****** Manufacturer/Factory,Trading Company Shanghai, Shanghai 2024-12-17 08:45
He****** Manufacturer/Factory Zhengzhou, Henan 2024-12-16 14:46
Ya****** Manufacturer/Factory Yantai, Shandong 2024-12-16 14:01
EZ****** Manufacturer/Factory Changsha, Hunan 2024-12-16 11:28