Rescue Boat

  • Date Posted: 2024-09-25 21:20 From English Site
  • Time Left:14D left
  • Purchase Quantity: 2 Piece(s)
  • Trade Terms:CIF
  • Max budget:>50000 USD
  • Payment Terms:T/T
  • Sourcing Request From:Request From: Tanzania
  • Shipping Method:Sea freight
  • Destination Port: Dar es Salaam
  • Lead time:Ship in 180 day(s) after supplier receives the initial payment.
Quote Left: 3
Product Description Buyer Business Info.
Hull Material
The boat's hull material and section scantling shall be marine fiber reinforced plastic (FRP).
CE Certification
The design of the boat's hull shall be V-shaped for intended roles mentioned in S/No 2.
Boat must have double skinned hull to prevent water ingress during possible collision. (Mandatory requirement).
G. A during tender submission
Supplier shall submit a general arrangement plan showing features stated in the technical requirement to assist in the technical evaluation.
Main Particulars
Length over all, LOA L= 8-10 meters.
Breadth, Beam B = As per design
Moulded Depth, D = As per design
Design draft, T = As per design (Maximum draft shall not exceed 1.2
Meters)

Kindly find attached document for more specifications

Quotation Record 7 supplier(s) have provided quotations. Only 3 quoting chance(s) left!

Company Name Business Type Location Quote Time
Op****** Manufacturer/Factory Shijiazhuang, Hebei 2024-10-20 08:59
Qi****** Manufacturer/Factory,Trading Company,Group Corporation Qingdao, Shandong 2024-10-07 20:21
Qi****** Manufacturer/Factory Qingdao, Shandong 2024-09-27 09:05
Sh****** Manufacturer/Factory,Trading Company Shanghai, Shanghai 2024-09-26 16:34
Ni****** Manufacturer/Factory,Trading Company Ningbo, Zhejiang 2024-09-25 22:56
To****** Manufacturer/Factory & Trading Company Hangzhou, Zhejiang 2024-09-25 22:51
Ei****** Manufacturer/Factory Shenzhen, Guangdong 2024-09-25 22:01