Home Easy Sourcing All Sourcing Requests Metallurgy, Mineral & Energy Hv/Mv Transformer 25 Mva Manufacturing and Supply
No quote chance left as 1 sourcing request could get 10 quotes at most.

Hv/Mv Transformer 25 Mva Manufacturing and Supply

  • Date Posted: 2024-10-11 10:10 From English Site
  • Valid to:2024-12-29
  • Purchase Quantity: 129 Piece(s)
  • Trade Terms:FOB
  • Target Unit Price:50000.00 USD
  • Max budget:>50000 USD
  • Payment Terms:T/T
  • Sourcing Request From:Request From: Poland
  • Shipping Method:Sea freight
  • Destination Port: Hamburg
  • Lead time:Ship in 365 day(s) after supplier receives the initial payment.
Quote Now
Quote Left: 0
Product Description Buyer Business Info.
Below are the detailed specifications for the transformers we require:

Rated Power of Windings (MVA)

HV: 25, 31.5, 40

LV: 25, 31.5, 40

Rated Voltage (kV)

HV: 115

LV: 16.5, 22

Voltage Regulation on the HV Side: ±16% at minimum ±11 steps

Frequency: 50 Hz

Layout and Connection Group: YNd11

Short Circuit Voltage (% HV-LV): 18

Cooling System: ONAN (with additional forced cooling system)

No-load Current (%): 0.1

No-load Losses (kW)

For 25 MVA: 10

For 31.5 MVA: 11.5

For 40 MVA: 13

Exceeding these loss values and the partial discharge (PD) level will result in contractual penalties as per the agreement.

Load Losses (kW)

For 25 MVA: 140

For 31.5 MVA: 150

For 40 MVA: 185

Partial Discharge Level: Less then 150 PC

Partial Discharge Level of HV and HV-LV Bushing Insulators: Less then 10 PC

Required Sound Power Level (dB(A))

For 25 MVA: 76 (ONAN); 79 (ONAF)

For 31.5 MVA: 77 (ONAN); 80 (ONAF)

For 40 MVA: 79 (ONAN); 82 (ONAF)
Measurement required according to the standard at rated voltage and rated current.

We require the following quantities and specifications for each transformer type:

25 MVA:

110/15: 112 units

110/20: 4 units

31.5 MVA:

110/15: 4 units

110/20: 2 units

40 MVA:

110/15: 5 units

25/16/16 MVA:

110/15/6: 1 unit

31.5/6.5/25 MVA:

110/30/15: 1 unit

Additionally, could you please provide information regarding your typical lead time for the manufacturing and delivery of these products?

The deadline for submitting the quote is November 9, 2024. The full technical specification is attached for your reference.

We appreciate your time and consideration of this RFQ and look forward to the possibility of working together. Please do not hesitate to reach out if you have any questions or require additional information.

Quotation Record 9 supplier(s) have provided quotations. Only 0 quoting chance(s) left!

Company Name Business Type Location Quote Time
Qi****** Manufacturer/Factory,Trading Company,Group Corporation Wenzhou, Zhejiang 2024-10-12 07:27
Sh****** Manufacturer/Factory,Trading Company Shanghai, Shanghai 2024-10-11 17:38
Zh****** Manufacturer/Factory Wenzhou, Zhejiang 2024-10-11 16:17
Si****** Manufacturer/Factory Deyang, Sichuan 2024-10-11 14:45
CE****** Manufacturer/Factory & Trading Company Nanjing, Jiangsu 2024-10-11 14:02
Zh****** Manufacturer/Factory & Trading Company Ningbo, Zhejiang 2024-10-11 13:31
Wu****** Trading Company Wuhan, Hubei 2024-10-11 11:30
Sh****** Manufacturer/Factory Wenzhou, Zhejiang 2024-10-11 10:41
Na****** Manufacturer/Factory,Trading Company Nanjing, Jiangsu 2024-10-11 10:18