S. NO Item Description Specifications / Details Qty
1.1 Smoke Tube Fired Boiler & Accessories 1 TPH 175 psi(g), Boiler Instruments & Controls, Mounted Valves, Water Level Control (ON/OFF), Main Steam Globe Valve & NRV, Blow Down Valves, Chimney, Ladder & Platform, Painting, Insulation & SS304 Cladding 01 Set
1.2 Dual Fuel Burner Make: FBR Italy, Mechanical Cam, Two Stage, Fuel: Natural Gas + Diesel/LSD/LDO, Gas Train/Oil Train Included 01 No.
1.3 Electrical Control Panel IP 54, Indoor Vertical Skid Mounted, Components: Schneider/ABB/Finder/Omron/Equivalent 01 No.
1.4 PLC System for Boiler Siemens Simatic S7, HMI: Wintek 10", Alarms/Trends: 7 Days 01 Set
1.5 Field Instruments Complete Set of Field Instruments for Boiler 01 Lot
1.6 Feed Water Pumps 02 Nos. Per Boiler (01 Working + 01 Standby), Total: 04 Nos. 04 Nos.
1.7 Transportation Loading & Transportation to site near Islamabad 01 Lot
1.8 Commissioning & Power Test Complete Commissioning & Power Testing of Boiler System Included
_ Feed Water Tank System 150 USG ASTM A36, On/Off Level Control, Motorized Valve, Temp Control, Insulation, SS304 Cladding & Painting 01 Lot
_ Oil Tank & Accessories 1000L ASTM A36, Level Control, HFO Supply Provision, Brushing, Painting, 3m Steel Support Structure 01 No.
_ Water Flow Meter Flow Measurement Device 01 No.
Shandong_Yantai, Shandong
2025-05-17
Shandong_Qingdao, Shandong
2025-05-17
Guangdong_Shenzhen, Guangdong
2025-05-16
Guangdong_Guangzhou, Guangdong
2025-05-16
Guangdong_Dongguan, Guangdong
2025-05-16
Henan_Zhoukou, Henan
2025-05-16
Guangdong_Shenzhen, Guangdong
2025-05-16