Esterquats Production Plant Select RFQ

  • Date Posted: 2024-03-05 10:47 From English Site
  • Time Left:5D left
  • Purchase Quantity: 1 Set(s)
  • Trade Terms:FOB
  • Target Unit Price:200000.00 USD
  • Max budget:>50000 USD
  • Payment Terms:T/T
  • Sourcing Request From:Request From: Jordan
  • Shipping Method:Sea freight
  • Destination Port: Aqaba
  • Lead time:Ship in 30 day(s) after supplier receives the initial payment.
Quote Left: 1
Product Description Buyer Business Info.
Dear Sir,
I hope my email finds you well,

We are Force Technology for industrial machinery (FORSTEC Group); Jordan.
This is Engineer Ahmed; Responsible for the Projects Development department at the company.
FORSTEC is one of the pioneer and leading Industrial Solutions Provider and Turn-Key projects in Jordan, as well as the Middle East and North Africa region (MENA).
Kindly find our Company profile attached FYI.

One of our customers is looking for Turnkey Project to produce 50TPD Esterquats to use it producing Fabric softener.
Our Customer Is looking for a turnkey project including processing parts, Utilities & installation materials.

I. Project description

Esterquats production is a two-stage process involving esterification and quaternization. Esteramines, an intermediate for the production of esterquats is produced by esterifying of palm-based fatty acid and triethanolamine in the presence of hypophosphorus acid of 50% purity.
The finish material produced as Esterquats will be the main raw material for liquid fabric softeners


II. Project Information
Raw material: Palm Oil FFA (Free fatty Acid), carboxyl ethynyl & triethanolamine.
Finish Product: Esterquats
Required Processing capacity: 50TPD (24hr. )

III. Required information and Details:
Kindly consider that the proposal should include the following:

-To Provide Consumptions (Water, Power, Air...etc. )
-To Provide Area Required for your machines and what are the required utilities.
-To Provide Clear Photos and videos for the machines while running and 3D Simulation if Available.
-To Provide Test results of the Finish Product as reference. If available from your previous cases.
-To Provide the Configuration List for the machines.
-To Provide Famous brands for Electrical, Hydraulic & Pneumatic parts.
-To Provide heavy duty Mechanical parts bearings and seals.
-To Provide Layout (CAD) Drawing, Flow Chart Diagram and PID "Process Instrument Diagram" if available
-To Provide Recommended spare parts list For 2 years
-To Provide an Instruction Manual. If available
-To Provide a maintenance (troubleshooting) manual.
-To Provide an Installation manual.
-To Provide a Pneumatic diagram. *
-To Provide an Electrical diagram. *
-To Provide the Hydraulic diagram. *
*The electrical diagram, Hydraulic diagram, and pneumatic diagram should match the real situation and connections on the machine.
**Each connection on the machine should have a name tag matching the diagrams.
-To provide a backup Soft Copy and USB copy of the PLC program and HMI program.
-The HMI and all diagrams, and manuals should be in English language and should not include any information of the supplier.
-The HMI should be with complete Production/Fault Indication messages.
-The HMI should include an Input/Output (I/O) List page, Automatic function, and also should include a Manual page for the manual control of each machine function separately.
-All machines should be without any nameplates of the supplier on it, and instead should be with (Forstec Company Information Nameplate with Serial number only).
-The supplier should provide a (Timeline Schedule) for machines manufacturing and there should be a weekly update on the (Timeline Schedule) status.

Attached Files

Please sign in to download the attachments if you are Premium Member.

Quotation Record 7 supplier(s) have provided quotations. Only 1 quoting chance(s) left!

Company Name Business Type Location Quote Time
HE****** Manufacturer/Factory,Trading Company,Group Corporation Shanghai, Shanghai 2024-05-17 13:17
Zh****** Manufacturer/Factory & Trading Company Lishui, Zhejiang 2024-04-09 14:36
GY****** Manufacturer/Factory,Trading Company Tianjin, Tianjin 2024-03-06 12:51
Do****** Manufacturer/Factory & Trading Company Dongguan, Guangdong 2024-03-05 22:55
Ma****** Manufacturer/Factory,Trading Company Shenzhen, Guangdong 2024-03-05 21:44
Sh****** Manufacturer/Factory & Trading Company Shanghai, Shanghai 2024-03-05 11:36
Li****** Trading Company Anshan, Liaoning 2024-03-05 11:03